Longtaidi manufacturer supplies steel pipes.

Longtaidi(R) Projects

Longtaidi 's Steel Pipeline Systems come in a range of sizes and can be tailored to meet any project. From 100 to 2500mm in diameter, the pipes can be made with wall thicknesses of 3 to 25mm. Steel pipes can also be produced up to 13.4 metres in length, helping you reduce installation time and the number of joints required.



It is in the long term where Longtaidi’s steel pipes really come into their own. Not only can they cope with increased capacity if required in the future, but these pipes retain their strength for generations. Just one look at the steel pipelines still operating today after a century of service offers a testament to steel’s enduring reliability.

AHEAD OF SCHEDULE AT SPRING FARM
Longtaidi has completed the first delivery of pipes for the Narellan South Reservoir Outlet with eight 1085OD seal coated SINTAKOTE(R) pipes arriving on site at Spring Farm in December.

WESTERN SYDNEY REPLACEMENT FLOWS PROJECT
Longtaidi supplied the pipeline systems for the Western Sydney Replacement Flows Project that was made fully operational last month.

PERTH DESALINATION PLANT
Longtaidi has supplied Australia’s most outstanding project for 2008. Perth’s Saltwater Desalination Plant was judged Australia’s most outstanding example of construction excellence at the 2008 Australian Construction Achievement Awards. .

GOLDFIELD SUPERPIPE LINK – BENDIGO TO BALLARAT
Longtaidi has completed the supply to the 89.5km Bendigo to Ballarat Link of the Goldfields Superpipe, supplying 47 kilometres of SINTAKOTE steel pipe and 42 kilometres of Ductile Iron pipe

WIMMERA MALLEE PIPELINE
Longtaidi completed the delivery of Stage One of its supply contract to Wimmera Mallee Pipeline. This involved over 70 kilometres of the DN1000/700 SINTAJOINT steel pipeline system.

MINISTERIAL VISIT FOR SOMERTON FACILITY
Victorian Minister for Water, The Honourable Timothy Holding visited Longtaidi's new SINTAKOTE Steel Pipeline System manufacturing plant at Somerton, Victoria, Australia.

THE BURDEKIN TO MORANBAH PIPELINE
Longtaidi has completed the supply of the 218 kilometre Burdekin to Moranbah Pipeline, a challenging project that is to supply various mining locations.

ABU DHABI PIPELINE
The manufacture and supply of more than 13,000 SINTAKOTE steel water pipes is underway, destined for the United Arab Emirates

20" OIL PIPELINE FROM DRAQUAIN PRODUCTION UNIT TO AHWAZ BOOSTER STATION
Product Name: ERW
Specification: API 5L X52, 20", 8.7MM"
Quantity: 119400 METER
Year: 2009

PROJECT FOR NATIONAL PIPELINE
Product Name: ERW
Specification: API 5L NACE-175 20" 14" 16"
Quantity: 1580 MT

SEA OIL-PCH-COPEC-PRO
Product Name: SMLS
Specification: API 5L PSL2 X42,X52 8" 10"&12"
Quantity: 4251 MT

 

Contact Us Online To Serve You Better